The One

Essay specific features

 

Issue:

History

 

Written by:

Cheri L

 

Date added:

May 22, 2012

 

Level:

University

 

Grade:

A

 

No of pages / words:

8 / 2205

 

Was viewed:

6057 times

 

Rating of current essay:

 
Essay content:

Which tasks must be done first, and which ones may follow? Finally, our concern is attaining desired output efficiently, without using unnecessary input resources. Capacity, Sequencing and Efficiency Let’s illustrate these ideas with an example. A manufacturer is developing plans for a facility to make 320 aluminum storm windows...
displayed 300 characters

Custom written essay

All essays are written from scratch by professional writers according to your instructions and delivered to your email on time. Prices start from $10.99/page

Order custom paper

Full essays database

You get access to all the essays and can view as many of them as you like for as little as $28.95/month

Buy database access

Order custom writing paper now!

  • Your research paper is written
    by certified writers
  • Your requirements and targets are
    always met
  • You are able to control the progress
    of your writing assignment
  • You get a chance to become an
    excellent student!

Get a price guote

 
 

The desired minimum daily output capacity is 320 windows. Figure-I and Table-I show the tentative assembly line layout. The operations manager wants to know if this is a good design and if better designs are possible. A B C D E F G H Figure-I : Diagram for storm window assembly line Table – I: Initial assembly line layout for aluminum storm windows |Work |Preceding |Task Assigned |Task’s Required |Task Time/Unit | |Station |Work | |Predecessor |(in seconds) | | |Station | | | | |1 |- |A: Assemble Frame |None |70 | |2 |1 |B: Install rubber molding |A |80 | |3 |2 |C: Install frame screws |A |40 | | | |D: Install frame each |A |20 | |4 |3 |E: Install frame handle |A |40 | | | |F: Install glass pane |B, C |30 | |5 |4 |G: Cover frame screws |C |50 | |6 |5 |H: Pack window unit |D, E, F, G |50 | | | | |Total |380 | This is a good design if the sequence and assignments meet the following criteria: ? They produce the desired output capacity ? They are feasible ? They are efficient Is Capacity Adequate? The number of units this layout allows the company to produce each day depends on the station whose tasks take the longest time to perform...
displayed 300 characters

General issues of this essay:

Related essays:

x
Services